BALSAM FIR SPECIAL - 6-8' SHEARED - $29.50

Johnathan Green Contractors Grass Seed Mixture

Product Description

Jonathan Green Contractor’s Grass Seed is the ideal grass seed mixture for soil stabilization or temporary lawn seeding. Contractor’s mix contains annual ryegrass so it germinates quickly and provides a fast grass cover. It is most often used by new home builders to establish a lawn quickly because it provides an excellent value for the price. Contractor’s Mix can be overseeded with any Black Beauty® Grass Seed Mixture to grow a lawn that will persist for years to come.  This seed germinates in 7-10 days.  For full sun to part shade ( 4 - 8 hours of sun).

Coverage & Pricing:

25 lb Bag - $69.99 - Overseeding - Seeds up to 6,500 sq. ft. -- New Lawns - Seeds up to 3,250 sq. ft.

50 lb Bag - $229.98 -  Overseeding - Seeds up to 13,000 sq. ft. -- New Lawns - Seeds up to 6,500 sq. ft.

 

Sku:
In-store quantities & prices may vary on some items.
Maximum quantity available reached.

For the best results, follow the directions below for establishing a new lawn or overseeding an existing one.

Prepare:

Mow – Mow the lawn at the lowest mower setting before seeding to allow the seed to reach the soil.

Rake – Rake over the existing grass with a metal rake to remove the thatch layer and any debris to loosen the soil.  Add additional topsoil to fill in holes and level the ground.

Check soil pH level – Have a soil test taken to check your soil’s pH level.  The optimum soil pH should be between 6.2 to 7.0.  For a pH below 6.2 use Jonathan Green MAG-I-CAL® Plus for Acidic and Hard Soil to rapidly increase pH. If the pH is above 7.0 use MAG-I-CAL® Plus for Alkaline and Hard Soil to rapidly decrease the soil pH.

Seed:

When to apply – The best time to apply seed is mid-August to mid-October while the ground is still warm and the nights are cooler.  Mid-March through mid-May is the next best time to plant when the soil temperature reaches 55º+ Fahrenheit and the temperature of the air stays consistently warm.

Spread seed – Apply half of the seed with a rotary spreader in one direction (north to south) and the remainder in the opposite direction (east to west).  It is beneficial to spread a new seeding fertilizer that is high in phosphorus at this time as well.

Rake seed – Rake lightly into the ground with a metal rake.  Walk with light, even footsteps on the seedbed to firm the soil around the seed.  Do not bury the seed more than one-fourth of an inch deep.

Maintain:

Water – For best germination, water daily to keep the seedbed moist.  Continue watering regularly for a few weeks until the grass plants reach a height of 2 – 2.5 inches.

Mow – Begin mowing when the new grass has reached a height of 3 – 4 inches.  Make sure the mower has sharp blades.  Be careful not to scalp the lawn, low mowing will stress the root system and encourage the growth of weeds.

 

Grass Type: Annual Ryegrass Grass

Color: Green

Recommended Planting Months:

For cool-season grasses

Mid-August through mid-October

Mid-March through mid-May

Sun Tolerance: Good

Shade Tolerance: Fair

Light Requirements: Full Sun to Part Shade (4 – 8 hours of sun)

Drought Tolerance: Fair I

nsect and Disease Resistance: Fair

High Traffic Tolerance: Fair

Planting Depth: ¼ inches

Germination Time: 7 - 14 days

 

Click the link to the Jonathan Green Product Page and navigate to the Spreader Settings tab for recommended spreader settings. https://www.jonathangreen.com/product/contractors-grass-seed.html